Location Jakarta-Bandung, Indonesia Length 93mi (150km) Estimated Investment $6.07bn Construction Started 2016 Expand The interiors of the high-speed EMU will feature traditional Indonesian Megamendung batik motifs. Credit: China Railway Construction Corporation (CRRC).
Director, PwC Indonesia Tel: +62 21 509 92901 Email Agung Wiryawan Partner, PwC Indonesia Tel: +62 21 509 92901 Email Investor Daily - PT Kereta Api Indonesia China (KCIC) is preparing to hasten track laying to accelerate the completion of Jakarta-Bandung High-Speed Railway project.
When the consortium PT Kereta Cepat Indonesia China (KCIC) was established, KCIC was obligated to provide a capital of around RP21.56 trillion. This is 25% of the estimated cost of Jakarta-Bandung High-Speed Railway worth US$6.07 billion or Rp86.25 trillion in total.
Danusari Mitra Sejahtera ( Engineering, Procurement, Construction + Fabrication ) - Perusahaan Pabrik Baja di Indonesia. Proyek High Speed Railway Contractor Consortium yang dikerjakan oleh tim dari PT Wijaya Karya (Persero) dengan tim dari PT Danusari Mitra Sejahtera.

China and Indonesia signed an agreement in October 2015 to establish the joint venture to build and operate the Jakarta-Bandung High Speed Railway. Its construction has been in full swing since 2018.

JAKARTA --- Konsorsium badan usaha milik negara yang menggarap proyek kereta cepat Jakarta-Bandung belum memutuskan sumber dana yang akan digunakan untuk membangun mega proyek tersebut. Sekretaris Perusahaan PT Wijaya Karya Tbk (Wika), Suradi Wongso Surano, mengatakan masih mencari sumber pendanaan sebagai modal konsorsium.

"Saat ini, High Speed Railway Contractor Consortium (HSRCC), KCIC, beserta pemanufaktur sarana dan prasarana terkait, didampingi oleh KAI sedang merumuskan check list untuk semua sub-sistem yang dibutuhkan KCJB, baik itu terkait EMU, railway system maupun operasional," kata Mirza, Minggu (28/3/2021).

JnnH.
  • n67u873kx1.pages.dev/363
  • n67u873kx1.pages.dev/12
  • n67u873kx1.pages.dev/3
  • n67u873kx1.pages.dev/375
  • n67u873kx1.pages.dev/86
  • n67u873kx1.pages.dev/326
  • n67u873kx1.pages.dev/362
  • n67u873kx1.pages.dev/204
  • n67u873kx1.pages.dev/57
  • alamat high speed railway contractor consortium